19
2. Basic factory configuration of sintering curve: (for reference
only)
Program code description
Note: 1. When using the sintering program, a maximum of three
sintering trays can be placed inside the furnace.
2. it is necessary to heat the empty furnace to clean it every one or two
weeks.
3. Raise the lifting platform to the top when not use to prevent foreign
objects or dust from entering the furnace to contaminate it.
Program code Description
P01 UPCERA ST single crown
P02 UPCERA ST short bridge
P03 UPCERA ST long bridge
P04 Xiangtong, less than 5 units
P05 Xiangtong, more than 5 units
P06 UPCERA color zirconia sngle crown
P07 UPCERA color zirconia short bridge
P08 UPCERA color zirconia long bridge
P09-P19 Undened, for sintering curve customization
P20
Cleaning program. when use the new furnace or the
one which haven’t been used for a long time,
please choose P20 to work whole process with an
empty sintering plate in .