WehoPuts 10
WehoPuts 5
2.2.1 Planning
Issues to note when planning
A location is chosen taking
into account treatment plant
maintenance (i.e. not inside
recreational areas)
Location must not be inside a
pit gathering surface water
Determining electrical and
drain connections and pos-
sible need for pumping.
Treatment plant discharge and
over ow must be arranged so
that no backfl ow to the plant
can occur
The discharge and over ow
pipes are separately led into
the discharge location.
Freezing and ground frost
damage are prevented using
insulation if necessary.
Storm water and irrigation
water must not be drained
into the treatment plant.
The drain is ventilated to the
roof of the building.
If necessary, a discharge plug
is installed to prevent rodents
from entering the discharge
pipe.
Treated water discharge
location is chosen taking into
account the local conditions.
Discharge water may only be
soaked if the absorption capa-
bility of the soil is su cient.
The absorption well or area
is measured based on the
amount of water absorbed
at one time, and a bypass
option is arranged in case of
clogging.
It is preferable to install an
inspection pipe in front of
the treatment plant. If the
discharge pipe is long, an
inspection pipe should also be
installed.
NOTE! Ensure discharge and over-
ow pipe functionality in winter
conditions
2.3 Installation
2.3.1 Before installation
Before installation, verify that
the tanks or treatment plant
equipment have not been
damaged during transport.
Remove the anchor package
from the sides of the plant.
Take out the parts and sup-
plies packed inside the plant.
2.3.2 Digging trench
Pay attention to work safety
when digging the trench, and
leave su cient working room
around the treatment plant.
Level and mechanically
compress the bottom of the
trench using sand or gravel
(bedding level min. 150mm).
Ensure that the bottom of the
trench is level under the tank
Make subsurface drains in
trenches dug inside clay or
bedrock.
Overflow pipe 110
Overflow pipe Ø110
Outlet Ø110
Inlet alternative 2
Inlet alternative 1
Overflow pipe
Ø 110
Overflow pipe Ø110
Outlet Ø110
Inlet alternative 2
Inlet alternative 1
8

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Uponor WehoPuts Series and is the answer not in the manual?

Uponor WehoPuts Series Specifications

General IconGeneral
BrandUponor
ModelWehoPuts Series
CategoryWater System
LanguageEnglish

Related product manuals