EasyManua.ls Logo

Vaillant eco TEC plus 428 - User Manual

Vaillant eco TEC plus 428
172 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
For the installer
Instructions for installation and servicing
ecoTEC plus
GB
Wall hung open vent condensing boiler
Supplied by HeatingSpares247.com

Table of Contents

Questions and Answers

Summary

Introduction: Documentation Notes and Retention

Introduction: ecoTEC Plus Boiler Overview

Overview of ecoTEC plus boilers, system compatibility, and automatic operation.

Introduction: General Notes and Design

Information on the boiler's design, flue system, and diagnostic features.

Boiler Specifications

Boiler Specifications: Technical Data

Comprehensive table of technical specifications for ecoTEC plus models.

Boiler Specifications: Dimensions and Installation Elements

Diagrams showing boiler dimensions and key installation components.

General Requirements

General Requirements: Site and Gas Supply

Guidance on selecting installation site and connecting the gas supply.

General Requirements: Flue System Options

Details on available flue systems, termination, and internal installation.

General Requirements: Water Systems and Controls

Requirements for hot water cylinders, condensate, controls, and system flushing.

General Requirements: Sealed Water Systems

Details on safety valves, expansion vessels, and pressure gauges for sealed systems.

Boiler Installation Sequence

Boiler Installation: Location and Delivery

Guidance on boiler location, clearances, and items included in the delivery.

Boiler Installation: Flue and Gas Connections

Instructions for flue exit options and safe gas connection procedures.

Boiler Installation: Water and Electrical Connections

Steps for water connections, condensate drain, and electrical hook-up.

Boiler Installation: Controls Integration

Details on connecting optional controls, timers, and the VR 65 control centre.

Commissioning (Part I)

Commissioning: Preliminaries and Gas Checks

Initial system preparation and gas supply testing before commissioning.

Commissioning: Initial Lighting and Troubleshooting

Procedures for initial boiler lighting and addressing ignition or flue issues.

Natural Gas to LPG Conversion Process

Functional Checks Commissioning (Part II)

Functional Checks: Heating and Hot Water

Steps to verify heating and domestic hot water system functionality.

Functional Checks: User Handover and Warranty

Guidance for user instruction, servicing importance, and warranty information.

Inspection and Maintenance

Inspection & Maintenance: Initial Checks and Safety

Crucial safety steps and initial inspection procedures before maintenance.

Inspection & Maintenance: Routine Tasks

Overview of annual inspection and maintenance steps for the boiler.

Inspection & Maintenance: Component Servicing

Procedures for servicing the spark electrode, burner, and heat exchanger.

Inspection & Maintenance: System Checks and Re-commissioning

Steps for testing operation, checking seals, and recommissioning the boiler.

Combustion Analysis

Combustion Analysis: CO2 Check and Adjustment

Procedure for measuring and adjusting CO2 for optimal combustion performance.

Troubleshooting

Troubleshooting: Logical Fault Finding Steps

A systematic approach to diagnosing boiler faults before using codes.

Troubleshooting: Status and Diagnostic Codes

Explanation of status codes and how to access diagnostic information.

Troubleshooting: Fault Codes and Memory Access

Details on fault codes, their causes, and accessing the fault memory.

Parts Replacement

Parts Replacement: Safety and General Notes

Essential safety instructions and general guidelines for replacing parts.

Parts Replacement: Component Procedures

Step-by-step instructions for replacing specific components like burner, gas valve, fan.

Recycling and Disposal

Recycling & Disposal: Appliance and Packaging

Information on environmentally responsible disposal of the appliance and packaging.

Vaillant Service and Maintenance

Appendix: EC Declaration of Conformity

Summary

Introduction: Documentation Notes and Retention

Introduction: ecoTEC Plus Boiler Overview

Overview of ecoTEC plus boilers, system compatibility, and automatic operation.

Introduction: General Notes and Design

Information on the boiler's design, flue system, and diagnostic features.

Boiler Specifications

Boiler Specifications: Technical Data

Comprehensive table of technical specifications for ecoTEC plus models.

Boiler Specifications: Dimensions and Installation Elements

Diagrams showing boiler dimensions and key installation components.

General Requirements

General Requirements: Site and Gas Supply

Guidance on selecting installation site and connecting the gas supply.

General Requirements: Flue System Options

Details on available flue systems, termination, and internal installation.

General Requirements: Water Systems and Controls

Requirements for hot water cylinders, condensate, controls, and system flushing.

General Requirements: Sealed Water Systems

Details on safety valves, expansion vessels, and pressure gauges for sealed systems.

Boiler Installation Sequence

Boiler Installation: Location and Delivery

Guidance on boiler location, clearances, and items included in the delivery.

Boiler Installation: Flue and Gas Connections

Instructions for flue exit options and safe gas connection procedures.

Boiler Installation: Water and Electrical Connections

Steps for water connections, condensate drain, and electrical hook-up.

Boiler Installation: Controls Integration

Details on connecting optional controls, timers, and the VR 65 control centre.

Commissioning (Part I)

Commissioning: Preliminaries and Gas Checks

Initial system preparation and gas supply testing before commissioning.

Commissioning: Initial Lighting and Troubleshooting

Procedures for initial boiler lighting and addressing ignition or flue issues.

Natural Gas to LPG Conversion Process

Functional Checks Commissioning (Part II)

Functional Checks: Heating and Hot Water

Steps to verify heating and domestic hot water system functionality.

Functional Checks: User Handover and Warranty

Guidance for user instruction, servicing importance, and warranty information.

Inspection and Maintenance

Inspection & Maintenance: Initial Checks and Safety

Crucial safety steps and initial inspection procedures before maintenance.

Inspection & Maintenance: Routine Tasks

Overview of annual inspection and maintenance steps for the boiler.

Inspection & Maintenance: Component Servicing

Procedures for servicing the spark electrode, burner, and heat exchanger.

Inspection & Maintenance: System Checks and Re-commissioning

Steps for testing operation, checking seals, and recommissioning the boiler.

Combustion Analysis

Combustion Analysis: CO2 Check and Adjustment

Procedure for measuring and adjusting CO2 for optimal combustion performance.

Troubleshooting

Troubleshooting: Logical Fault Finding Steps

A systematic approach to diagnosing boiler faults before using codes.

Troubleshooting: Status and Diagnostic Codes

Explanation of status codes and how to access diagnostic information.

Troubleshooting: Fault Codes and Memory Access

Details on fault codes, their causes, and accessing the fault memory.

Parts Replacement

Parts Replacement: Safety and General Notes

Essential safety instructions and general guidelines for replacing parts.

Parts Replacement: Component Procedures

Step-by-step instructions for replacing specific components like burner, gas valve, fan.

Recycling and Disposal

Recycling & Disposal: Appliance and Packaging

Information on environmentally responsible disposal of the appliance and packaging.

Vaillant Service and Maintenance

Appendix: EC Declaration of Conformity

Vaillant eco TEC plus 428 Specifications

General IconGeneral
ModelecoTEC plus 428
CategoryBoiler
Output28 kW
Fuel TypeNatural Gas
Weight37 kg
MountingWall-mounted
ErP RatingA
Max. Working Pressure3 bar

Related product manuals