EasyManua.ls Logo

Vaillant Vantage 120 User Manual

Vaillant Vantage 120
36 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
2140100
ETC 00394
9411064
Installation Instructions
Unvented hot water storage cylinders
for use with Vaillant boilers
GB
Vaillant Vantage 120
Vaillant Vantage 150
Vaillant Vantage 200
Question and Answer IconNeed help?

Do you have a question about the Vaillant Vantage 120 and is the answer not in the manual?

Vaillant Vantage 120 Specifications

General IconGeneral
BrandVaillant
ModelVantage 120
CategoryBoiler
LanguageEnglish

Summary

Product Description

Notes for Installers

Important safety and compliance notes for installers, including package contents and storage.

Technical Data

Dimensions

Connection Details Overview

Diagram illustrating and labeling all connection points on the VANTAGE cylinder.

Applications

Typical Applications by Property

Lists typical property types and bathroom configurations for each VANTAGE cylinder size.

Functional Diagrams

Primary Circuit Diagram

Diagram illustrating the primary heating circuit connections and components of the VANTAGE system.

Secondary Connections Diagram

Diagram detailing the secondary domestic hot water (DHW) circuit connections and safety devices.

Functional Description

Temperature and Heating Control

Explains domestic hot water temperature control and central heating control mechanisms.

Primary Circuit Description

Details the primary circuit connection to Vaillant system boilers and their built-in components.

Secondary System Components

Lists safety and control devices for unvented DHW operation and expansion vessel details.

Immersion Heater and Secondary Return

Describes the auxiliary immersion heater and the secondary return connection for larger systems.

Installation Requirements

Siting and Water Supply

Requirements for cylinder placement, frost protection, and mains water pressure/flow.

Pipework and Discharge Guidelines

Guidance on secondary system pipework, primary circuit pipework, and discharge pipework requirements.

High Level Termination Safety

Criteria for determining suitable high-level discharge points, considering safety and environmental factors.

Installation Procedure

Primary Pipework Installation

Steps for connecting primary circuit pipework between the boiler and cylinder.

Secondary System Pipework

Steps for connecting the cold water supply and control valves to the VANTAGE.

Safety Valve Discharge Pipework

Connecting safety valves to the tundish and installing discharge pipework.

Electrical Connections and Controls

Wiring the immersion heater and connecting cylinder thermostat, 3-port valve, and external controls.

Control System Wiring Schemes

Provides wiring diagrams for various programmers and room thermostats with the VANTAGE system.

Commissioning the System

Filling and Flushing Procedures

Procedure for filling and flushing the secondary DHW and primary CH circuits.

Boiler Operation and User Guidance

Instructions for operating the boiler, setting thermostats, and providing user guidance.

Maintenance Schedule

Fault Finding Guide

Fault A: Cold Cylinder Water

Troubleshooting guide for when the cylinder water is cold, with diagnostic steps.

Fault B: Discharging Expansion Relief Valve

Troubleshooting guide for water discharge from the expansion relief valve.

Fault C: Discharging TPRV

Troubleshooting guide for water discharge from the temperature/pressure relief valve.

Fault D: Poor Water Pressure and Flow

Troubleshooting guide for reduced water pressure and flow from hot water outlets.

Related product manuals