EasyManua.ls Logo

Valach VM 120 B2-4T - User Manual

Valach VM 120 B2-4T
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
Toni Clark practical scale GmbH
Instructions
Question and Answer IconNeed help?

Do you have a question about the Valach VM 120 B2-4T and is the answer not in the manual?

Summary

Engine Specifications

Engine Operation and Setup

Engine application

Details the intended use of the VM 120 B2-4T engine in model airplanes.

Description of the engine

Explains the VM 120 B2-4T's four-stroke, flat twin OHV design and ignition.

Fuel

Provides guidance on recommended fuel types, octane rating, and oil mixture ratios.

Mounting the intake RAM tube

Instructions for correctly mounting the intake RAM tube for proper engine operation.

Mounting the prop shaft

Details the procedure for screwing the prop shaft into the hub using thread locking adhesive.

Installation

Guidance on mounting the engine to the firewall and considerations for standoffs.

Fuel tank

Recommendations for fuel tank size, filter type, and fuel tubing connections.

The ignition

Instructions on mounting the ignition Hall sensor and connecting the battery.

Exhaust header

Information on exhaust header length effects and assembly with steel flanges.

Silencer

Discusses different silencer options and their impact on power and noise levels.

Crank case venting

Explains the function of crankcase venting and how to manage oil discharge.

Carburetor

Details on the Walbro carburetor, needle settings, and throttle linkage.

Propeller

Recommended propeller sizes and considerations for optimal RPM range.

Tighten the prop screws the right way

Instructions on properly tightening propeller screws to prevent loosening and ensure safety.

Safety instructions, the right use of propellers

Essential safety precautions regarding propeller operation and inspection.

Starting the engine

Step-by-step guide for starting the engine, including first start and subsequent starts.

Ignition safety shut off

Explanation of the ignition's automatic shut-off feature and battery management.

Breaking-in the engine

Procedure for the initial engine breaking-in period, including mixture and RPM limits.

Maintenance

General maintenance guidelines, including valve gap checks and lubrication.

Changing the spark plugs

Instructions on how to safely change spark plugs on a cold engine.

Adjusting the valve gap

Detailed steps for measuring and adjusting the valve gap using feeler gauges.

Lubrication

Recommendations for lubricating rocker arm bearings and valve shafts.

Repair

Contact information for engine repair and technical assistance.

Scope of supply

List of all components included with the engine package.

Appendix: Basics of Petrol Engines

Engine cooling

Discusses principles of effective engine cooling through cowling design and airflow.

Example of installation, the VM 170 B2-4 T in a EMW 3 m Pitts

Shows an example installation of a similar engine model in a specific aircraft.

Installation of the fuel tank

Guidance on fuel tank placement, fuel line routing, and filter selection.

Fuel tank connections

Details on making fuel tank air vents and connecting fuel lines securely.

Fuel tubing

Recommendations for suitable fuel tubing materials and installation practices.

Installation of the ignition

Instructions for properly installing the ignition system components and wiring.

Carburetor linkage

Details on creating and adjusting the linkage for the throttle and choke arms.

Valach VM 120 B2-4T Specifications

General IconGeneral
Cylinders2
Fuel TypePetrol
Fuel systemCarburetor
IgnitionElectronic
CoolingAir-cooled
Displacement120 cm³
Type4-stroke, air-cooled, twin-cylinder boxer