SMART HATCH
9
3.1.2. Make note of all the parts that
should be included for the installation.
3.1.3. Interior installation - Remove backing
tape from both butyl seals. Insert the hatch
through the roof opening diagonally and place
the bottom of the frame on the roof surface.
NOTES
Surfaces must be clean and dry to ensure proper sealing of
butyl tape on bus roof. Application temperature range for
butyl is +50ºF to +125ºF (+10ºC to +52ºC).
(Photo 3: SMART Hatch Assembly)
(Photo 4: SMART Hatch Assembly)