NOTE: The snap bushing inserted on this page will be used for
wires routed to the tailcone area in the remainder of this section.
Step 1: Drill #30 a pilot hole above the upper of the two wire run holes
(now filled with snap bushings) in the lower part of the F-1207D-L
Baggage Bulkhead Channel. Place the hole above the upper hole the
same distance as is in between the lower two holes. See Figure 1.
Use a step drill to enlarge the #30 hole to 3/8.
Insert a snap bushing into the hole per the callout in Figure 1.
F-1207D-L
EXISTING
WIRE RUNS
SB375-4
DRILL #30
ENLARGE 3/8
42D-11
010/03/11
REVISION:
RV-12
DATE: PAGEREVISION:DATE:
VAN'S AIRCRAFT, INC.
FIGURE 1: ADDING A
WIRE RUN BUSHING