Do you have a question about the Vapac LE30 and is the answer not in the manual?
Guidelines for unit placement, access, and steam pipe slope.
Instructions for control cabling, transformer connections, and EMC compliance.
Guidelines for unit placement, access, ventilation, and clearances.
Guidelines for steam pipe placement, slope, and condensate drainage.
Best practices for connecting steam hoses, including length and support.
Specifies water quality limits, hardness, pH, pressure, and conductivity.
Proper methods for connecting drains, ensuring grounding and fall.
Steps for safely connecting the unit's power supply, voltage checks.
Guidelines for screened cables, conduit entry, and EMC compliance.
Checklist for water supply, steam lines, power, and control connections before start-up.
Step-by-step guide for initial start-up, configuration, and commissioning.
Procedure for commissioning the unit after initial setup and configuration.
Step-by-step guide for safely exchanging the steam cylinder.
Explains the meaning of user LED states during the initial setup process.
Explains LED indications for faults like drain, feed, over current, and service intervals.
Procedure to temporarily postpone service alerts without addressing the root cause.
Step-by-step guide to service the unit after a fault or for maintenance.
Guide to diagnosing and resolving common issues like no power, feed faults, or low output.
Procedures for checking and replacing Solid State Relays (SSRs) by a qualified electrician.
Loading...