These instructions contain operating information and should be left with the unit.
Electrode Boiler Units
LE
Installation & Operation Manual
Edition 3.2.2
(For use with Software version 7.1 & subsequent issues)
Installation in countries covered by EC Directives:
This product meets the requirements of the RoHS Directive 2002/95/EEC
This product will meet the requirements of the Low Voltage Safety Directive
2006/95/
EEC and the EMC
Directive
2004/108/
EEC when installed in accordance with the instructions contained in this manual.
Failure to comply with these instructions may invalidate the manufacturer's warranty or any
certificate/declaration of conformance requested to be supplied with the unit.
Question and Answer IconNeed help?

Do you have a question about the Vapac LE45 and is the answer not in the manual?

Summary

Important Installation Points

Important Electrical Connection Items

Essential guidelines for connecting electrical components and ensuring proper installation.

Important Maintenance Items

Crucial points for performing maintenance safely and effectively.

1.0 Installation

1.2 Positioning the steam pipes

Guidelines for correctly positioning steam pipes for optimal performance.

1.3 Plumbing Considerations.

1.4 Electrical Connections

1.4.1 Important E.M.C. Considerations

Guidelines for electromagnetic compatibility to minimize interference.

1.4.2 Power Supply Connection

Procedures for connecting the main power supply to the unit.

1.5 Cylinder Electrical demand loads

1.6 Control Circuit Connections

1.6.6 Security Circuit; E.P.O. Shutdown

Connecting E.P.O. switches and other control interlocks.

1.6.7 Load Shed Option

Enabling load shedding to limit power usage during peak periods.

1.6.8 Master;Slave System

Interconnecting units to operate as a master/slave system.

2.0 Start-Up; Operation

2.1 Service Advice

2.1.1 Procedure for cylinder Exchange.

Step-by-step instructions for replacing the steam cylinder.

2.2 Service and Maintenance

3.0 Location of Indicators and Controls

3.2 Initial Set-up

3.3 Normal Run; Standby; Start-up - No User Intervention Required

3.4 Fault; Service Indications - Requiring Operator Intervention.

3.4.1 To Postpone the Sevice:

How to temporarily postpone service indications and alarms.

3.4.2 To Service the unit:

Procedure for servicing the unit and resetting relevant timers.

4.0 Trouble-shooting Check List

5.0 Wiring diagram

Vapac LE45 Specifications

General IconGeneral
BrandVapac
ModelLE45
CategoryBoiler
LanguageEnglish