EasyManua.ls Logo

Vapac LE05 - User Manual

Default Icon
46 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
These instructions contain operating information and should be left with the unit.
Electrode Boiler Units
LE
Installation & Operation Manual
Edition 3.2.2
(For use with Software version 7.1 & subsequent issues)
Installation in countries covered by EC Directives:
This product meets the requirements of the RoHS Directive 2002/95/EEC
This product will meet the requirements of the Low Voltage Safety Directive
2006/95/
EEC and the EMC
Directive
2004/108/
EEC when installed in accordance with the instructions contained in this manual.
Failure to comply with these instructions may invalidate the manufacturer's warranty or any
certificate/declaration of conformance requested to be supplied with the unit.
Question and Answer IconNeed help?

Do you have a question about the Vapac LE05 and is the answer not in the manual?

Summary

Important Installation Points

Electrical Connection Items

Guidelines for secure and compliant electrical connections.

Maintenance Items

Essential points for carrying out maintenance safely.

Steam Pipe Positioning

Plumbing Considerations

Cold Water Supply Requirements

Water quality parameters for optimal Vapac unit operation.

Drain Connection Guidelines

Proper routing and connection of drain pipework.

Electrical Connections

Power Supply and Control Terminals

Electrical Connection Details

Unit Power Connection Diagrams

LExx Unit Power Connections

Wiring diagrams for LExx units without Solid State Relays.

LExxP Unit Power Connections

Wiring diagrams for LExxP units with Solid State Relays.

Cylinder Electrical Demand Loads

LExx Unit Electrical Loads (LE05-LE30)

Electrical load data for LE05, LE09, LE18, LE30 models.

LExx Unit Electrical Loads (LE45-LE90)

LExx Unit Electrical Loads (LE110)

LExxP Unit Electrical Demand Loads (LE05 P-LE30 P)

LExxP Unit Electrical Demand Loads (LE45 P-LE90 P)

Control Circuit Connections

Sensing Head and Security Features

Security Circuit and E.P.O. Shutdown

Connecting E.P.O. switches and other interlocks.

Master;Slave System Configuration

Start-Up and Operation

Start-Up Checklist

Pre-operation checks for water, steam, power, and control connections.

Start-Up Instructions

Steps to follow during the initial unit start-up procedure.

Service Advice

Cylinder Exchange Procedure

Step-by-step guide for replacing the steam cylinder.

Service and Maintenance

Initial Set-Up Procedures

Normal Operation States

Fault and Service Indications

Servicing the Unit

Troubleshooting Checklist

Wiring Diagrams

Wiring Diagrams (cont.)

Guide to Positioning Steam Pipes

Vapac LE05 Specifications

General IconGeneral
ModelLE05
TypeElectric Boiler
Output5 kg/h
Water Capacity5 liters
Weight25 kg
Power5 kW
Voltage230 V
Frequency50 Hz
Power SupplySingle Phase

Related product manuals