B
D
E
F
H
A
C
G
K
J
5.1 Full Clean / Disassembly
1. Turn on the VS3 while empty and
use the silicone bellows to clean
our any residual coffee particles.
2. Remove the power supply.
3. Remove the tools from the parts
bag supplied.
4. Remove the hopper by rotating
anti-clockwise, gently place
this to the side and remove the
adjustment collar also.
5. Carefully remove the small ring
bearing
A
.
6. Next gently pull the outer burr
B
up and out.
7. Using the tool provided, loosen
the set nut
C
on the inner burr by
cranking the tool clockwise.
8. Once the set nut has been
released, you will notice 1 x locking
washer
D
, remove and place to
the side.
9. Remove the inner burr
E
, revealing
1 x thin washer
F
on top of the
lower grounds spindle
H
,
remove
this also.
10. Remove the lower grounds
spindle
H
.
11. Clean the grounds spindle and
remove any residue coffee from
inside the burr chamber
K
or on
drivehaft
J
.
12. Lastly, remove the 4 x springs
from the burr chamber.
13