EasyManua.ls Logo

Vaughan Junior - Irrigator Maintenance Schedule

Default Icon
20 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Maintenance
(Applicable to all Models)
2 x Riser Bearings
Bearings (2 each side)
Main Cog every 3 months
1. Grease all points approximately once a week.
2. Before you use your irrigator, grease the main cog and then periodically every 12 months.
3. When using the irrigator for euent, use old sump oil or similar and pour over the cable which
will extend its life.
4. The right angle ange at the bottom of the vertical shaft has a slow drain uming rubber (“V”
rubber seal) in it which may need replacing peridotcly. Just undo the two bolts holding it in
place and it will come o.
5. The cable passes through a steel cotton reel and on some older models, a ceramic insulator.
This is a sacricial part and is designed to wear and break protecting your cable from fraying.
When this roller is broken it should be replaced immediately.