7.5,
HOT WATER SUPPLY.
· Check that the pressure inside the steam boiler is 1.2 bar
(0.12 MPa) indicated on the pressure gauge (2).
· Remove the lance (3) from the machine.
ATTENTION: The lance (3) is very hot.
Move the lance only with proper rubber
protection; Danger of scalding.
· Place a cup under the lance (3).
· Open the tap slowly turning the knob (4) counterclockwise.
· Once you reach the desired amount, close the tap (4).
NEWManuale_DomobarJunior2B_Rev0_01-2016_5lingue.indd 22 17/03/16 17:21