Figure 105. ISD Monthly Status Report - Serial to PC Format (Example report with Veeder-Root Polisher)
isd-evr\937-12alt.eps
IV0200
JAN 8, 2008 3:53 PM
(SITE NAME)
(SITE STREET)
(CITY, ST)
(PHONE)
ISD MONTHLY STATUS REPORT
EVR TYPE: BALANCE
ISD TYPE: XX.XX
VAPOR PROCESSOR TYPE: VEEDER-ROOT POLISHER
OVERALL STATUS :FAIL EVR VAPOR COLLECTION :FAIL
EVR VAPOR CONTAINMENT :WARN
ISD MONITOR UP-TIME :100% STAGE I TRANSFERS: 33 of 33 PASS
EVR/ISD PASS TIME : 77% VAPOR PROCESSOR :WARN
CARB EVR CERTIFIED OPERATING REQUIREMENTS
ISD MONITORING TEST PASS/FAIL THRESHOLDS
PERIOD BELOW ABOVE
VAPOR COLLECTION BALANCE SYS FLOW PERFORMANCE 1DAYS 0.60 ----
VAPOR CONTAINMENT GROSS FAIL, 95th PERCENTILE 7DAYS ---- 1.30"wcg
VAPOR CONTAINMENT DEGRADATION, 75th PERCENTILE 30DAYS ---- 0.30"wcg
VAPOR CONTAINMENT LEAK DETECTION FAIL @2"WCG 7DAYS ---- 12.5cfh
STAGE I VAPOR TRANSFER FAIL, 50th PERCENTILE 20MINS ---- 2.50"wcg
VAPOR PROCESSOR MASS EMISSION FAIL (LB/1KG) 1DAYS ---- 0.32
WARNING ALARMS
DATE TIME DESCRIPTION READING VALUE
07-12-30 00:02:33 VAPOR CONTAINMENT LEAKAGE CFH@2 INCHES WC 15.51
07-12-29 00:02:07 VAPOR CONTAINMENT LEAKAGE CFH@2 INCHES WC 18.24
07-12-28 00:02:01 VAPOR CONTAINMENT LEAKAGE CFH@2 INCHES WC 17.34
07-12-27 00:01:36 VAPOR CONTAINMENT LEAKAGE CFH@2 INCHES WC 17.11
07-12-26 00:01:41 VAPOR CONTAINMENT LEAKAGE CFH@2 INCHES WC 18.66
07-12-10 00:02:05 FLOW PERFORMANCE HOSE BLOCKAGE FP 8 BLEND4 BLKD
FAILURE ALARMS
DATE TIME DESCRIPTION READING VALUE
07-12-11 00:02:05 FLOW PERFORMANCE HOSE BLOCKAGE FP 8 BLEND4 BLKD
SHUTDOWN & MISCELLANEOUS EVENTS
DATE TIME DESCRIPTION ACTION/NAME
07-12-11 00:02:18 FLOW PERFORMANCE BLK DISABLED FP 08