EasyManua.ls Logo

VELTIUM LITE Zero - Page 11

Default Icon
34 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
11
INSTALLATION
MANUAL
6
PREPARE THE CHARGER INSTALLATION
1. Mark the holes to be made.
2. Drill the holes.
3. Fit the wall plugs.
Insert the screw of the upper part and tighten it into the bushing as far as it will go.
7
FIT THE UPPER SCREW
Wall mounting: 4.8x38 screw
STAND assembly: M5x12 screw
3- INSTALLATION
In the case of the STAND, use the screws supplied with it in the
packaging.
8 mm
1
2
3

Other manuals for VELTIUM LITE Zero