Do you have a question about the VER-MAC PCMS-320 and is the answer not in the manual?
| Model | PCMS-320 |
|---|---|
| Viewing Angle | 140 degrees |
| Operating Voltage | 12V DC |
| Operating Temperature | -20°C to 70°C |
| Installation | Trailer-mounted |
General guidelines and importance of equipment maintenance.
Information needed when contacting support for issues.
Step-by-step guide for deploying the trailer.
Procedures for setting up and adjusting the signboard and solar array.
Procedures for taking down the signboard and solar array.
Step-by-step guide for removing the trailer.
Explanation of the electric brake system on PCMS trailers.
Procedures for testing the trailer's electric brake system.
Maintenance procedures for the electric brake system.
Explanation of the hydraulic surge brake system on PCMS trailers.
Procedures for testing the hydraulic surge brake system.
Maintenance procedures for the hydraulic surge brake system.
Information on the trailer breakaway system and its function.
Periodic maintenance schedule for brakes and breakaway systems.
Periodic maintenance checks for the mast assembly.
Information on the hydraulic lift system for raising and lowering the mast.
Procedures for operating the mast using the hydraulic system.
Step-by-step guide to raising the mast using a winch.
Step-by-step guide to lowering the mast using a winch.
Procedures for orienting and tilting solar panels for optimal power.
Periodic maintenance for the solar array components.
Preventive maintenance for deep-cycle batteries.
Procedures for charging and testing battery health.
Maintenance procedures for sealed batteries.
How to check the state of charge for sealed batteries.
Periodic maintenance checks for the battery bank components.
Steps for setting up solar panels and the camera, ensuring no collision.
Procedures for taking down solar panels and camera to prevent damage.
Loading...