EasyManua.ls Logo

Vertiv Liebert CW - Page 21

Vertiv Liebert CW
76 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2. Using the provided rigging-fastener kit and the instructions included in the kit, install the
rigging hardware for lifting the unit from the skid. Figure 3.4 below, shows an example of one
of the eye nuts installed.
Figure 3.4 Rigging-fastener eye nut installed
3 Equipment Inspection and Handling
17

Related product manuals