EasyManua.ls Logo

Vertiv Liebert CW - Page 22

Vertiv Liebert CW
76 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3. Attach the recommended rigging equipment to the eye-nuts installed in Step 2.
4. Using the rigging equipment, lift the unit from the skid, and remove the skid from under the
unit, see Figure 3.5 below.
Figure 3.5 Lifting unit and removing skid
Vertiv | Lieber CW™ Installer/User Guide
18

Related product manuals