3. Attach the recommended rigging equipment to the eye-nuts installed in Step 2.
4. Using the rigging equipment, lift the unit from the skid, and remove the skid from under the
unit, see Figure 3.5 below.
Figure 3.5 Lifting unit and removing skid
Vertiv | Liebert® CW™ Installer/User Guide
18