EasyManua.ls Logo

VEVOR BATHROOM MASTER - Page 11

VEVOR BATHROOM MASTER
20 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
- 10 -
4. Loosen the screws and remove the power box cover, pass the power
cord through the ceiling. Connect the power cord according to the
wiring diagram, and then lock the power box cover with screws. (See
the Fig.3.)
WIRING DIAGRAM:

Related product manuals