INSTALLATION AND OPERATION
A. Installation
(1) Remove the package, move the machine to the proper place, and check the
goods according to the packing list. If there exist differences, please get in touch
with a distributor.
(2) Operating environment
a. Ambient temperature range: 10°C38°C
b. Ambient humidity: relative humidity90%
c. The machine should be placed indoors in a drafty environment for better
ventilation efficiency. More than 20cm of space is required around the machine.
(As shown in Figure 6)
d. Avoid direct sunlight and keep the machine away from the heat source. To
avoid water and other liquid splashing into the machine, do not place it in a
humid or easily-splashing place.
(3) Installation of the Tank Assembly
Agitator type
a. Please clean the beverage-contacted parts
before use.
Embed the mixing shaft into the stationary shaft
at the bottom and rotate it left-right to the proper
position.
a. Fix the bearing sleeve onto the bearing, then
put the impeller mounted on the sleeve with the
blade side up.
b. Fix the sealing ring to the bottom of the
evaporator, and ensure that the sealing and
evaporator fit tightly. During this process, dip the
sealing ring in some water or vase line, which.