EasyManua.ls Logo

VEVOR LP18A - Page 8

VEVOR LP18A
16 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
- 8 -
Installation of Tank:
c. Before installing the tank, dip the sealing ring
with some Vase line, which works as lubricant.
Then install the tank to the supporting block, hold
the tank diagonally and press downward evenly, if
succeed, the tank will locked on the right position
and will not tilt.
Installation of beater
d. Fix the beater onto the mixing shaft, rotate it
left- right until to the right position.Wear the
discharging valve with o-ring and put it in the
discharging hole, and match with discharging
handle.
e. Feed the tank with some water, check the
evaporator chassis and discharging valve, if there
has a leak, please repeat the third step and then
cover the tank lid.

Related product manuals