48
ENGLISH
All models VA358 are equipped with a level
gauge to keep the water level inside the boiler
constant.
When using the machine for the first time, it is
advisable to fill the boiler by hand to avoid
damaging the electrical resistor and turning on
the electronic protection.
If this should happen, just turn the machine off
and then start it up again to complete its load-
ing procedure.
To fill the boiler manually for the first time, pro-
ceed as follows:
UHPRYHWKHJULGDQGWKHGULSWUD\
WXUQWKHPDQXDO³A´OHYHOWDSVRWKDWZDWHU
will enter the boiler;
DIWHUDERXWVHFRQGVVKXW RIIWKHYDOYH
´A´DVLOOXVWUDWHGLQWKHIROORZLQJILJXUH
)LJ
VZLWFKRQWKHPDFKLQH
3.1 FILLING BOILER
MANUALLY
3. ADJUSTMENTS TO BE MADE BY A
QUALIFIED TECHNICIAN ONLY
3.2 PUMP
ADJUSTMENT
NOTE: This operation can be carried out while
the machine is turned on.
To adjust the service pressure of the boiler,
thus regulating the water temperature, accord-
ing to the various functions and needs of the
coffee desired, proceed as follows:
7XUQWKHSXPSUHJLVWUDWLRQVFUHZWXUQLQJLW
clockwise to INCREASE and counter clock
wise to DECREASE the pressure;
)LJ
Advisable pressure: 9 bar
The set pump pressure is displayed in the
pressure gauge, inside the machine;
)LJ
1234
5
)LJ
KEY
Black
Gray
3 Brown
IRU9 / monophase voltage:
4 Blue
5 Yellow - green
This operation must be carried out with the
machine is turned off.
WARNING
A