12
500 l
Fig. 5
1. Reconnect the cylinder to the pipework.
2.
Insert new gaskets
A
underneath flange covers
B
.
3.
Fit flange cover
B
and tighten the screws with a
maximum torque of 25 Nm.
4. Fill the cylinder from the DHW side.
Retighten the flange cover with a maximum torque
of 25 Nm.
5.
Push earth cable
C
onto tab
D
.
6. Fit the thermometer sensor (if installed).
7.
Fit thermal insulation mat
E
, cover
F
and cap
G
.
Commissioning, inspection, maintenance
Returning the cylinder to use
5677344