EasyManua.ls Logo

Viessmann Vitola 200 User Manual

Viessmann Vitola 200
32 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
VITOLA 200
Installation Instructions
for use by heating contractor
Vitola 200
VB2 Series
Oil-/Gas-Fired Boiler
Heating input 83 to 300 MBH
24 to 88 kW
Read and save these instructions
for fu tu re reference.
IMPORTANT
5167 404 v1.9 01/2004

Other manuals for Viessmann Vitola 200

Question and Answer IconNeed help?

Do you have a question about the Viessmann Vitola 200 and is the answer not in the manual?

Viessmann Vitola 200 Specifications

General IconGeneral
BrandViessmann
ModelVitola 200
CategoryBoiler
LanguageEnglish

Summary

Safety, Installation and Warranty Requirements

Licensed professional heating contractor

Installation, adjustment, service, and maintenance must be performed by a licensed professional.

Contaminated air

Air contamination can cause poisonous by-products and damage equipment.

Fresh air

Equipment requires adequate fresh air for safe operation and combustion.

Product documentation

Read all applicable documentation before installation and store for future reference.

Carbon monoxide

Improper installation can cause flue products and carbon monoxide to enter living space.

Equipment venting

Never operate without a safe venting system to prevent carbon monoxide poisoning.

Advice to owner

Familiarize the owner with equipment operation, safety, and maintenance needs.

Warranty

Information in documentation must be read and followed; failure voids warranty.

Safety Requirements

Important Regulatory and Installation Requirements

Details codes, regulations, and installation requirements.

Mechanical room

Specifies requirements for the mechanical room where the boiler is installed.

Working on the equipment

Outlines precautions and procedures for servicing the boiler.

Technical literature

Lists applicable literature for the boiler and mentions where to find it.

General Information

About these Installation Instructions

Provides explanations of symbols and notations used throughout the manual.

Product Information

Description of the boiler type, its heating surfaces, and system compatibility.

Mechanical Room

Requirements for the mechanical room, including location and environmental considerations.

Fresh Air

Combustion Air Supply

Details requirements for adequate combustion and ventilation air supply per codes.

Combustion air opening (gas-fired installations)

Specifies minimum round duct diameters for gas-fired installations.

Ventilation air opening (gas-fired installations)

Defines ventilation air opening requirements for gas-fired installations.

Combustion air opening (oil-fired installations)

Specifies minimum round duct diameters for oil-fired installations.

Unconfined spaces

Air supply requirements for boilers located in unconfined building spaces.

Confined spaces

Air supply requirements for boilers located in confined building spaces.

Louvres and grilles

Guidance on calculating free area for openings considering louvers and grilles.

Ventilation air opening (oil-fired installations)

Defines ventilation air opening requirements for oil-fired installations.

Set-up

Product Delivery

Lists components to ensure are delivered with the boiler package.

Recommended Minimum Clearances for Service

Specifies minimum clearances around the boiler for maintenance and service.

Minimum Clearances to Combustibles

Details required clearances from the boiler to combustible materials.

Combustion Chamber

Dimensions and requirements for the boiler's combustion chamber.

Product Installation Alternatives

Illustrates different mounting options for the boiler, like on a stand or Vitocell.

Boiler Set-up and Location

Instructions for setting up the boiler, including base plate and leveling.

Enclosure Panel Installation

Step-by-step guide for installing the boiler's enclosure panels.

Mounting the Combustion Chamber Door

Procedure for positioning and fastening the combustion chamber door.

Connections

Venting Connection (Gas Installations)

Codes and safety requirements for venting gas-fired boilers.

Venting Connection (Oil Installations)

Codes and safety requirements for venting oil-fired boilers.

Venting Connection (Gas and Oil Installations)

Installation guidelines for connecting vent pipe adaptors and ensuring proper draft.

Water Side Connections

Instructions for connecting the boiler to the heating system's water circuits.

Safety Connections and Pressure Testing

Steps for installing safety devices and performing hydrostatic pressure tests.

DHW Connections

Information on connecting the boiler for domestic hot water production.

Installation Examples

General notes on schematics as guidelines and system layout considerations.

General

States that schematics are guidelines and specific layouts may need consultation.

Clearances

Specifies clearances for pipes to combustible construction.

Flow rates

Lists typical flow rates for the Vitola boiler at different temperature rises.

Electrical Connections

Steps for routing and connecting electrical power and low-voltage cables.

Top Panel Installation

Procedure for installing the top panel and boiler logo.

Burner / Fresh Air

Burner Installation

Instructions on mounting the supplied burner using metric M8 bolts.

Burner Information

Details on approved fuels for oil, natural gas, and propane burners.

Altering flue gas temperature

Method to increase flue gas temperature by drilling holes to prevent condensation.

Start-up/Appendix

Start-up Information

Guidance on organizing documentation and storing the service binder.

Technical Data

Table of required draft and flue gas temperatures at different boiler water temperatures.