Installation, adjustment, service, and maintenance must be performed by a licensed professional.
Air contamination can cause poisonous by-products and damage equipment.
Equipment requires adequate fresh air for safe operation and combustion.
Read all applicable documentation before installation and store for future reference.
Improper installation can cause flue products and carbon monoxide to enter living space.
Never operate without a safe venting system to prevent carbon monoxide poisoning.
Familiarize the owner with equipment operation, safety, and maintenance needs.
Information in documentation must be read and followed; failure voids warranty.
Details codes, regulations, and installation requirements.
Specifies requirements for the mechanical room where the boiler is installed.
Outlines precautions and procedures for servicing the boiler.
Lists applicable literature for the boiler and mentions where to find it.
Provides explanations of symbols and notations used throughout the manual.
Description of the boiler type, its heating surfaces, and system compatibility.
Requirements for the mechanical room, including location and environmental considerations.
Details requirements for adequate combustion and ventilation air supply per codes.
Specifies minimum round duct diameters for gas-fired installations.
Defines ventilation air opening requirements for gas-fired installations.
Specifies minimum round duct diameters for oil-fired installations.
Air supply requirements for boilers located in unconfined building spaces.
Air supply requirements for boilers located in confined building spaces.
Guidance on calculating free area for openings considering louvers and grilles.
Defines ventilation air opening requirements for oil-fired installations.
Lists components to ensure are delivered with the boiler package.
Specifies minimum clearances around the boiler for maintenance and service.
Details required clearances from the boiler to combustible materials.
Dimensions and requirements for the boiler's combustion chamber.
Illustrates different mounting options for the boiler, like on a stand or Vitocell.
Instructions for setting up the boiler, including base plate and leveling.
Step-by-step guide for installing the boiler's enclosure panels.
Procedure for positioning and fastening the combustion chamber door.
Codes and safety requirements for venting gas-fired boilers.
Codes and safety requirements for venting oil-fired boilers.
Installation guidelines for connecting vent pipe adaptors and ensuring proper draft.
Instructions for connecting the boiler to the heating system's water circuits.
Steps for installing safety devices and performing hydrostatic pressure tests.
Information on connecting the boiler for domestic hot water production.
General notes on schematics as guidelines and system layout considerations.
States that schematics are guidelines and specific layouts may need consultation.
Specifies clearances for pipes to combustible construction.
Lists typical flow rates for the Vitola boiler at different temperature rises.
Steps for routing and connecting electrical power and low-voltage cables.
Procedure for installing the top panel and boiler logo.
Instructions on mounting the supplied burner using metric M8 bolts.
Details on approved fuels for oil, natural gas, and propane burners.
Method to increase flue gas temperature by drilling holes to prevent condensation.
Guidance on organizing documentation and storing the service binder.
Table of required draft and flue gas temperatures at different boiler water temperatures.