44
For further information regarding the individual steps, see the page indicated
Commissioning steps
Inspection steps
Maintenance steps Page
• • •
1. Commissioning the system........................................... 45
• •
2. Shutting down the system............................................. 46
•
3. Removing the burner (if required)................................. 47
• •
4. Opening the boiler doors............................................... 47
• •
5. Opening the cleaning cover........................................... 48
•
6. Removing and cleaning turbulators (if installed)........ 48
•
7. Cleaning heating surface and flue gas collector......... 49
•
8. Cleaning the economiser heating surfaces................. 49
• •
9. Checking all gaskets/seals and packing cords on the
flue gas side
• •
10. Cleaning the sight glass in the cleaning aperture....... 50
• •
11. Checking thermal insulation components and
gaskets............................................................................ 51
• • •
12. Inserting turbulators (if appropriate) and closing the
boiler doors..................................................................... 53
• •
13. Securing the cleaning cover.......................................... 54
• •
14. Mounting the burner....................................................... 54
• • •
15. Checking all connections on the water and steam side
for leaks
• • •
16. Checking the inspection ports for leaks...................... 55
• •
17. Checking the water quality............................................ 55
• • •
18. Checking the installation room ventilation
• • •
19. Checking the flue pipe for tightness
• •
20. Adjusting the burner...................................................... 55
Commissioning, inspection, maintenance
Steps - commissioning, inspection and maintenance
5607 288 GB