33
Commissioning steps
Inspection steps
Maintenance steps Page
• • •
1. Commissioning the system............................................................................................... 34
• •
2. Shutting down the system................................................................................................. 35
•
3. Removing the burner (if required).................................................................................... 35
• •
4. Opening the boiler door(s)................................................................................................ 35
• •
5. Removing the inspection port closures........................................................................... 36
•
6. Removing and cleaning the turbulators (if installed)..................................................... 36
•
7. Cleaning the heating surface and flue gas collector...................................................... 37
•
8. Cleaning Economiser heating surfaces........................................................................... 37
• • •
9. Checking the gaskets and packing cords on the flue gas side
• •
10. Cleaning the sight glass.................................................................................................... 37
• • •
11. Checking the thermal insulation components and gaskets........................................... 38
• • •
12. Inserting turbulators (if installed) and closing boiler door(s)........................................ 38
• • •
13. Closing and securing the inspection ports..................................................................... 39
•
14. Checking the water chamber for deposits....................................................................... 39
• •
15. Checking the water side connections for tightness....................................................... 39
• •
16. Checking the tightness of the inspection ports.............................................................. 39
• • •
17. Checking the water level and system pressure.............................................................. 40
• • •
18. Checking the safety and control equipment
• • •
19. Checking the safety valve................................................................................................. 40
• •
20. Checking the water quality................................................................................................ 40
• •
21. Checking the thermal insulation
• • •
22. Checking the installation room ventilation
• • •
23. Checking the flue pipe for tightness
• •
24. Adjusting the burner.......................................................................................................... 41
Commissioning, inspection, maintenance
Steps - commissioning, inspection and maintenance