EasyManua.ls Logo

Viessmann VITOPLEX 100 - Page 26

Viessmann VITOPLEX 100
32 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
26
■ After filling, ensure there are no more
air cushions in the system. When the
temperature falls, gas cushions form
negative pressure and this can draw
air into the system.
■ After initial filling and commissioning,
but after 14 days at the latest, clean
the integral dirt trap so the heat trans-
fer medium can flow freely.
■ Following any losses through leaks or
drawing off, top up the antifreeze sol-
ution according to the concentration
already in place. Establish the volume
of antifreeze as a check.
Water quality
Using antifreeze in boilers
(cont.)
5692 701 GB