Commissioning steps
Inspection steps
Maintenance steps Page
• • •
1. Commissioning the system............................................................................................... 10
• •
2. Shutting down the system................................................................................................. 10
• •
3. Opening the boiler door and cleaning cover................................................................... 11
•
4. Cleaning the turbulators, heating surface, flue outlet and flue pipe............................. 11
• • •
5. Checking all gaskets and packing cords on the flue gas side
• • •
6. Checking the thermal insulation components on the boiler door................................. 12
•
7. Inserting turbulators; securing the boiler door and cleaning cover............................. 13
• • •
8. Checking connections and sensor well on the heating water side for tightness
• • •
9. Checking the function of the safety equipment.............................................................. 14
• • •
10. Checking the function of the pressure switch................................................................ 14
• • •
11. Checking the temperature controller setting if a building management system is
used (DCC system)............................................................................................................ 14
• • •
12. Checking the expansion vessel and system pressure................................................... 14
• • •
13. Checking the firm seating of electrical plug-in connections and cable grommets
• • •
14. Checking the thermal insulation
• •
15. Checking the water quality................................................................................................ 15
• •
16. Cleaning the sight glass in the boiler door...................................................................... 16
• •
17. Checking the mixer for ease of operation and tightness............................................... 16
• •
18. Checking the function of the return temperature raising facility (if installed)
• • •
19. Checking the installation room ventilation
• • •
20. Checking the flue pipe for tightness
• •
21. Adjusting the burner.......................................................................................................... 16
•
22. Instructing the system user.............................................................................................. 17
•
23. Operating and service documents................................................................................... 18
Commissioning, inspection, maintenance
Steps - commissioning, inspection and maintenance