EasyManua.ls Logo

Viking VFT - Section 7 - Bladder Tank First Filling; Separation Bladder

Viking VFT
35 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
BLADDER TANK MODEL VFT & FT
INSTALLATION, OPERATION AND
MAINTENANCE MANUAL
(
foam concentrate inside the bladder
)
TECHNICAL
MANUAL
F_032216 16.1 | TM1.3.1.1/14032016/en
The Viking Corporation, 210 N Industrial Park Drive, Hastings MI 49058
Telephone: 269-945-9501 Technical Services: 877-384-5464 Fax: 269-818-1680 Email: techsvcs@vikingcorp.com
VISIT THE VIKING WEBSITE FOR THE LATEST EDITION OF THIS TECHNICAL MANUAL
Page 15 of 35
SECTION 7 – BLADDER TANK FIRST FILLING
The bladder tank foam lling is a simple operation to perform if the instructions contained in this manual are carefully followed. The
lling process is a fundamental task determining the proper bladder tank performance when required to operate. Incorrect lling
may compromise the bladder’s lifetime or cause an immediate rupture. It is highly recommended that the installer/user contacts
Viking in case of doubts on the instructions shown in this manual. Viking is not responsible for any damage to the bladder if the
lling operation is not made by Viking.
7.1 Separation bladder
Viking certies and guarantees, with release of a test certicate, that all the separation bladders have been subjected to a
pneumatic pressure test for integrity assessment.
Viking guarantees the bladder integrity for one year starting from the delivery date;
Viking guarantees the bladder against tearing or bursting only and exclusively if the lling operation is performed by Viking’s
employees or by Viking authorized personnel. The operator performing the lling will validate this activity and activate the
warranty covering the bladder by sending back to Viking the certicate of warranty duly undersigned.
To avoid bladder damages the installation of a strainer upstream of the tank is recommended;
To avoid damaging the bladder, DO NOT perform welding on the tank body.
CAUTION