TC-9 Viper ™ Gate System
Residential Sliding Gate Operator
Adjustment and Maintenance
The following should be done periodically.
1. Check the wiring and operation of the GFCI Receptacle per the manufactures
procedures.
2. Apply a light coat of oil on the chain. Check for smooth operation (monthly).
3. Tighten Bolts on the Gate and Platform.
4. Verify that the Safety IR Beam Sensor operates correctly.
5. Verify that the Gate Limit Switches are in the correct position for Open and
Closed operations.
6. Disengage the Clutch using the Clutch Key. Check to see that the Gate can be
opened and closed manually. Note: Keep the Clutch Key near the Opener so
you can locate it easily if there is a power failure. Attach the Clutch Key to
the GFCI outlet box that is nearby.
7. Change the Security Codes Yearly in both the Viper Control Board and the
Remote Openers.