EasyManua.ls Logo

VMI Northstar E Manual Conversion - VMI Conversion Scheduled Maintenance Plan

VMI Northstar E Manual Conversion
48 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
maIntenance and Warranty
26
VMI CONVERSION SCHEDULED MAINTENANCE PLAN
Expenses associated with the above scheduled maintenance are not covered under the VMI Limited Warranty program.
Must be Performed Every 6 Months or 750 Ramp Cycles by an Authorized VMI Dealer
Door System · Inspect door for alignment, loose hardware, and abnormal wear
· Check damper for leaks
· Check for proper lubrication on top and bottom B pillar latches (white lithium grease)
· Inspect and replace normal wear items
· Remove oor plate and inspect ramp operation
· Inspect ramp mechanism for loose ttings, alignment, and abnormal wear
· Lubricate as needed
· Inspect and replace rubber bumpers and other normal wear items as required
Ramp System
Must be Performed Every 12 Months or 1,500 Ramp Cycles by an Authorized VMI Dealer
Undercarriage Inspection · Check undercarriage for component damage
· Check undercarriage for rust or corrosion and repair as necessary
· Inspect and replace normal wear items

Related product manuals