EasyManua.ls Logo

Wacker Neuson BPS1030

Wacker Neuson BPS1030
50 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Commissioning
7.3 Putting into operation
28
Operator’s Manual | BPS | 5100060589 | 07/2021 | [us]
B
2. Move choke lever 2 to position A when the engine is cold.
3. Move the choke lever to position B when the engine is warm.
4. Move the throttle lever 3 into position A.
5. Move the engine switch4 into positionA.
6. Pull the starting handle 5.
ð Pull the starting handle slightly until resistance is felt, then pull it
strongly. Slowly return the starting handle.

Related product manuals