BA D18 us* 1.1 * D18v100.fm 1-3
Foreword 1
Abbreviations (in alphabetic order)
Fig. Figure
o/h Operating hours
approx. approximately
PCM particulate matter catalysts
FGPS Front Guard Protective Structure
FOPS Falling Objects Protective Structure
if nec. if necessary
max. maximum
min. minimum
Pos. Position
ROPS Roll Over Protective Structure (without losing contact with the ground)
TOPS Tip Over Protective Structure
e.g. for example