BA D18 us* 1.1 * D18i400.fm 4-33
Putting into operation 4
Putting into operation for the first time and running-in period
Before putting the machine into operation for the first time, check whether
the equipment supplied with the machine is complete.
• Check the fluid levels according to chapter “Maintenance”.
Each machine is correctly adjusted and checked before it is delivered.
Handle the machine carefully during its first 50 operating hours.
• Do not load a cold engine.
• Warm up the machine at low engine speed and little load, do not warm
it up at a standstill.
• Do not change engine speed abruptly.
• Avoid using the machine under heavy loads or at high speeds.
• Avoid abrupt acceleration, braking and changing travel direction.
• Do not run the engine at high speed for extended periods.
• Observe the maintenance plans – see chapter “7.2 Maintenance
overview” on page 7-2.
Equipment for Austrian road traffic regulations StVZO (option)
Observe the national and regional regulations during machine travel on
public roads.
Scope of delivery of option Equipment for Austrian road traffic
regulations StVZO:
• Headlights and rear lights
• Turn indicators and clearance lights
• Rotating beacon
• Horn on steering-column lever
• Outside rearview mirrors on left and right
• Numberplate bracket and lights
• Wheel chock
The rear light unit A can be folded in for protection during machine
operation on non-public sites.
1. Remove lock pin B from the lock.
2. Fold the rear light unit A under the protection.
3. Insert lock pin B back into the lock.