7-22 BA EZ17 en* 1.1 * ez17w700.fm
7 Maintenance
2. Raise the canopy a little on either side, and press it into the anchoring.
3. Tighten screws C and D to 110 Nm (81 ft.lbs.). . The washers and
securing elements can be used again.
Raise the operator seat to improve access if necessary.
4. Tighten the screws E left and right.
5. Install the electric connector B if it is installed on the machine.
6. Remove shackle A from the roof and install it in the engine
compartment.
7. Install the roof lights if they are installed on the machine.
8. Close the engine cover.
Fig. 211
D
C
Fig. 212
E

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Wacker Neuson E13-01 and is the answer not in the manual?

Wacker Neuson E13-01 Specifications

General IconGeneral
BrandWacker Neuson
ModelE13-01
CategoryExcavators
LanguageEnglish

Related product manuals