BA EZ17 en* 1.1 * ez17i400.fm 4-3
Putting into operation 4
Unrolling/rolling up the rear tarpaulin
1. Stop and park the machine. Stop the engine. See “Preparing
lubrication”.
2. Unhitch both straps A and unroll the rear tarpaulin.
3. Fasten the belt C to the six points on the outside of the canopy.
Do not unhitch both upper straps C when rolling up the tarpaulin.