EasyManua.ls Logo

Wacker Neuson E13-01

Wacker Neuson E13-01
252 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4-2 BA EZ17 en* 1.1 * ez17i400.fm
4 Putting into operation
Rear tarpaulin (option)
Installing/removing
1. Stop and park the machine. Stop the engine. See “Preparing
lubrication”.
2. Roll up the rear tarpaulin and secure it with both straps A.
3. Push the rear tarpaulin into the frame or pull it out of the rail under it.
Hooks B must show inward (see figure 43).
Fig. 41
A
Fig. 42
Fig. 43 (shown inside)
B

Table of Contents

Related product manuals