EasyManua.ls Logo

Wacker Neuson E16-02

Wacker Neuson E16-02
302 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
BA E16 en* 1.0 * E16_10_700.fm 7-7
Maintenance 7
Maintenance schedule of Lehnhoff mechanical quickhitch system
Other maintenance intervals (Wacker Neuson service center):
Every 250 operating hours or semi-annually (MS03)
Every 500 operating hours or annually (MS03)
For additional details contact a Wacker Neuson service center.
L
L
L
M
M
G
H H
Y
L
L
N
N
K
K
Fig. 262 (symbolic representation)
Quickhitch maintenance MS03/MS08/MS10 (operator) Interval
1
Perform visual inspection of the quickhitch system --
10 hours of operation/
daily
Clean bolt guide G
50 hours of operation/
weekly
Clean the bolt contact surface H
50 hours of operation/
weekly
Clean bottom side of the quick coupler system Y
50 hours of operation/
weekly
Clean contact surfaces of the attachment K
50 hours of operation/
weekly
Clean the opening for the socket wrench and bores of the attachment support L
50 hours of operation/
weekly
Clean bolt attachment support M
50 hours of operation/
weekly
Clean centering pins (only MS10) N
50 hours of operation/
weekly
1. For time specifications: the first achieved time specification is decisive. If the situation requires it, perform maintenance if necessary, even if the maintenance
interval has not yet been reached.

Table of Contents

Related product manuals