EasyManua.ls Logo

Wacker Neuson PT2A - General Maintenance; Maintaining the Emission Control System; Periodic Maintenance Schedule

Wacker Neuson PT2A
208 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
wc_tx004595en.fm
29
PT2A / PT3A / PT4A General Maintenance
5 General Maintenance
5.1 Maintaining the Emission Control System
For machines sold in North America:
Normal maintenance, replacement, or repair of emission control devices and
systems may be performed by any repair establishment or individual; however,
warranty repairs must be performed by a dealer/service center authorized by
Wacker Neuson. The use of service parts that are not equivalent in performance
and durability to authorized parts may impair the effectiveness of the emission
control system and may have a bearing on the outcome of a warranty claim.
5.2 Periodic Maintenance Schedule
The table below lists basic machine and engine maintenance. Tasks designated
with check marks may be performed by the operator. Tasks designated with square
bullet points require special training and equipment.
Refer to the engine owner’s manual for additional information.
WARNING
A poorly maintained machine can malfunction, causing injuries or permanent
damage to the machine.
Keep the machine in safe operating condition by performing periodic
maintenance and making repairs as needed.
Daily before starting
Check external hardware.
Open pump housing cover and remove any debris from
inside of pump housing.
Inspect for leaks between pump and engine.
Check the condition of the fuel tank cap and drain plug
cap.
Check housing cover O-rings.
Inspect shockmounts for damage.

Table of Contents

Related product manuals