HEAVY DUTY
BRASS SHOWER PUMPS
Performance Shower Products
SERVICE HELPLINE TEL:
01883 730339
YOUR GUARANTEE IS AT RISK
IF PUMP NOT INSTALLED CORRECTLY.
SEE SECTION 2 IMPORTANT INSTRUCTIONS
Question and Answer IconNeed help?

Do you have a question about the Watermill BP65S and is the answer not in the manual?

Watermill BP65S Specifications

General IconGeneral
Power sourceElectric
Maximum suction height8 m
Pump housing materialPlastic
Frequency50 Hz
MaterialPlastic
Maximum flow rate6500 l/h
Max Flow Rate6500 l/h
Inlet/Outlet Size1 inch

Summary

Important Installation Instructions

Avoid Water Mains Pressure Connection

Do not connect the pump to water mains pressure; it cannot normally be used with combination boilers.

Pump Positioning and Operation

Preventing Dry Running

Do not let the pump run dry. Purge with water for 5 minutes before running and check for leaks.

Hot Water Cylinder Connections

Avoid Jointing Compounds

Do not use any jointing compounds for hot water cylinder connections.

Cold Water Supply Connection

Connection Restrictions

Avoid direct mains connection, use 22mm pipe, and position tank connector correctly.

Connecting the Pump

Pump Connection Best Practices

Use supplied hoses, ensure hose depth, use isolation valves, and align pipework correctly.

Electrical Connections

Mandatory Earthing Warning

This pump must be earthed. Electrical hazard will result if not correctly earthed.

Before Using the Pump

Pre-Use Warnings and Preparation

Do not run pump dry. Purge water, check for leaks, and inspect connections.

Fault Finding Guide

Guarantee Claim Procedure

Do Not Remove Pump for Claims

Do not remove the pump from installation, as this will invalidate the guarantee.