EasyManua.ls Logo

Watts AERCO Benchmark OMM-0137 - Next Steps

Watts AERCO Benchmark OMM-0137
62 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Benchmark Platinum-Edge [ii]: Installation Manual
SECTION 2 INSTALLATION
OMM-136_H • GF-210 1/6/2021 Technical Support • (800) 526-0288 • Mon-Fri, 8 am - 5 pm EST Page 46 of 62
2.16 Next Steps
Once the unit is physically installed per the instructions above, the next steps are:
Optionally, implement the onAER option, which allows your unit to be monitored
remotely. To implement this option, complete the instructions in the next section, onAER
Setup.
Start the unit for the first time and perform the combustion calibration procedure. For
instructions, see the Benchmark-Edge [i] Operation and Service Manual, OMM-0137
(GF-210), Section 4: Initial Startup.

Related product manuals