EasyManua.ls Logo

Weber Rescue Systems SPS 270 E-FORCE 2 - Shut-Down (End of Work)

Weber Rescue Systems SPS 270 E-FORCE 2
56 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...

• Checktheblades(fordamage)
• Inspectthespreaderps(fordamage)
• Checkthecontrolhandleincludingtherockerlever(funcon)
• Checkthehandle(secureaachment)
• Checktheprotecvecover(fordamage)

• Checkthepistonrod(fordamage)
• Checkthecontrolhandleincludingtherockerlever(funcon)
• Checktheplungers(fordamage)
• Checktheguidepiece(fordamage)
8.3Shut-down(endofwork)

Aerworkisover,thebladepsmustbeplacedoneabovetheothertopreventinjury.
Thebladesofthecungdevicemustnotbecompletelyclosed,asotherwisetensionwillbuild
up in the device.

Aerworkisover,thecylinder'spistonrodmustbecompletelyretracted,soastorelievethe
hydraulic load on the device.

Aerworkisover,thespreadingarmsmustremainslightlyopen,soastorelievethehydraulic
load on the device.


Table of Contents

Related product manuals