6 Commissioning | Commissioning with TwinCAT (EtherCAT)
29Manual Communication module UR20-4COM-IO-LINK2547720000/03/09.2019
6.6 Commissioning with TwinCAT (EtherCAT)
Installingthedevicedescriptionles
Before starting TwinCAT, copy the ESI files to the Twin-
CAT installation folder, e.g. C:\TwinCAT\3.1\Config\Io\
EtherCAT.
Existing folder structures in the ESI les must remain un-
changed when copying.
After starting TwinCAT3, the devices from the device de-
scription les are available in the hardware catalogue.
IntegratingIO-LinkmasterwithTwinCAT3
Start TwinCAT3.
Create a new project or open an existing project.
Establish an online connection to the EtherCAT master.
Switch to Solution Explorer.
Right-click I/O.
Select Scan... and follow the configuration wizard.
All the EtherCAT slaves available on the network are added.
IO-Link master in Solution Explorer
Parameterising IO-Link port with TwinCAT
The IO-Link ports are parameterised via the parameters of
the IO-Link master. An overview of all parameters can be
found in section 4.6.
In the Editor window of the coupler, switch to Startup.
The current parameter setting is displayed.
You can edit the parameter setting.
Double-click the parameter you want to edit.
The Edit dialogue box is opened.
Editing module parameters with TwinCAT
Change the value in the Data text field.
Click OK.
Use this method to edit all of the parameters that you
would like to change.
All settings only take effect once they have been
loaded into the component.