Part number 550-141-826/1014
This manual must only be used by a qualified heating installer/service technician. BEFORE
installing, read all instructions in this manual and all other information shipped with the
boiler. Perform steps in the order given. Failure to comply could result in severe personal
injury, death or substantial property damage.
Installation
Startup
• Maintenance
• Parts
Boiler Manual
Oil-Fired Water Boilers

Table of Contents

Other manuals for Weil-McLain WGO

Questions and Answers:

Weil-McLain WGO Specifications

General IconGeneral
ModelWGO
Heat Exchanger MaterialCast Iron
WeightVaries by model
CategoryBoiler
Ignition TypeStanding Pilot
Heating Capacity70, 000 - 260, 000 BTU/h

Summary

Hazard Definitions

DANGER Warning

Indicates hazards that will cause severe personal injury, death or substantial property damage.

WARNING Warning

Indicates hazards that can cause severe personal injury, death or substantial property damage.

Please Read Before Proceeding

Tips for Water Systems

Water Quality and Leaks

Check leaks, maintain pH 7.0-8.5, avoid petroleum sealants.

Operation

Troubleshooting Burner Firing

Steps to take if the burner does not fire.

Troubleshooting Common Problems

Rapid Cycling and Frequent Starts

Diagnosing frequent burner cycling and thermostat issues.

Water Loss and Leaks

Addressing frequent makeup water needs and relief valve discharge.

Domestic Water Temperature Problems

Troubleshooting tankless heater issues.

Before Installing Boiler

Compliance with Codes

Installations must comply with US and Canadian codes.

Required Clearances

Minimum clearances for service, door swing, and flue pipe.

Air for Combustion and Ventilation

Permanent Opening Requirements

Sizing and placement of openings for air intake.

Foundation Requirements

Foundation Installation Guidance

Laying a foundation and special considerations for garages.

Install Boiler - Packaged Boilers Only

Hydrostatic Pressure Testing

Procedure for filling and testing the boiler for leaks.

Install Boiler - Non-Packaged Boilers Only

Boiler Placement and Handling

Positioning non-packaged boilers, including splitting larger units.

Hydrostatic Pressure Test (Non-Packaged)

Install Boiler Controls

Control Tapping and Installation

Guidance on installing controls using tapping tables and diagrams.

Install Burner - All Boilers

P-WGO and A-WGO Boiler Installation

Steps for securing the burner, flange, and positioning the air tube.

Connect Breeching

Connect Water Piping

Connect Wiring

General Wiring Requirements

Adherence to electrical codes and standards.

High Temperature Limit Control

Installation and Setting

Adding and setting a secondary high temperature limit.

Boiler Wiring Diagrams

Blocked Vent Shutoff Switch Option

Installation and Wiring

Procedures for installing and wiring the BVSS.

Connect Oil Piping

Start-Up Procedures

Filling the System

Steps for filling and venting the boiler and system.

Placing Boiler in Operation

Final checks and steps to start the boiler.

Check-Out Procedure

Installation Verification Checklist

A checklist of completed installation and operational checks.

Annual Service Check List

Detailed Service Procedures

Cleaning Boiler Flueways

Step-by-step guide for cleaning internal boiler passages.

Handling Ceramic and Fiberglass Materials

Safety Precautions for Removal

Guidelines for safely removing chamber lining and insulation.

Close Clearance Installation

Burner Adjustment and Combustion Testing

Requirements for proper burner adjustment and performance.

Related product manuals