EasyManua.ls Logo

Welbilt ArcticFox - Page 34

Welbilt ArcticFox
37 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
www.welbilt.com 800-225-9916 34
Freezer Piping
Inspection Feature
Data
Accept
Reject
Action Required
Suction Lines Insulated:
Oil Trap at Base of Suction Riser:
Copper Drain Lines Sloped Min
1/2” ft:
Piping Supported Every 5’:
Copper drain line heater
attached, working, and insulated:
Copper Drain Line Trapped
Outside Freezer Space:
Cooler Condensing Unit
Inspection Feature
Data
Accept
Reject
Action Required
Model Number:
Serial Number:
Electrical Volts:
Electrical Phase:
Amperage @ L1:
Amperage @ L2:
Amperage @ L3:
Ambient Temp:
°F
Comp. Discharge Pressure:
PSIG
Comp. Suction Pressure:
PSIG
Suction Line Temp @ Comp.:
°F
Discharge Line Temp @ Comp.:
°F
Comp. Superheat:
°F
Defrost Setting (4 day/45 min):
All electrical connections are tight:
Unit base properly supported:
Fans Running & No Vibration:
All guards, covers attached:
Refrigerant Sight Glass Clear:
Comp. Oil Level @ ½ Sight Glass:
Comp. Mounting Clips Removed:
Suction line insulated fully and
properly supported:
Cooler Evaporator
Inspection Feature
Data
Accept
Reject
Action Required
Evaporator installed with nylon
bolts with proper airflow
clearance:
Model Number:
Serial Number:
Electrical Volts:
Electrical Phase:
Suction Line Temp @ Evap:
°F
Evap Superheat:
°F
Thermostat Set:
°F
Operating Temp:
°F
TXV Bulb Properly Mounted:
All guards, covers attached:
All electrical connections are
tight: