English
Installation and operating instructions Wilo-Control CC-Booster 11
NOTICE:
The maximum number of connections per hour
specified in the table for each power is determined
by the pump motor and must not be exceeded
(adjust the parameterisation of the controller
accordingly; see follow-up times, for example).
• Fuse on mains side in accordance with the infor
-
mation in the circuit diagram.
• Feed the ends of the mains cable through the
threaded cable glands and cable inlets and wire
them according to the markings on the terminal
strips.
• The 4-wire cable (L1, L2, L3, PE) is to be provided
on-site. The connection is established at the main
switch (Fig. 1a – e, item 1) or for systems of
higher power at the terminal strips in accordance
with the circuit diagram, the PE is connected to
the earth rail.
Power [kW]
(Column 1)
System impedance [Ω]
(Column 2)
Connections per hour
(Column 3)
3~400 V
2.2 0.257 12
2-pole
2.2 0.212 18
Direct starting
2.2 0.186 24
2.2 0.167 30
3.0 0.204 6
3.0 0.148 12
3.0 0.122 18
3.0 0.107 24
4.0 0.130 6
4.0 0.094 12
4.0 0.077 18
5.5 0.115 6
5.5 0.083 12
5.5 0.069 18
7.5 0.059 6
7.5 0.042 12
9.0 – 11.0 0.037 6
9.0 – 11.0 0.027 12
15.0 0.024 6
15.0 0.017 12
3~400 V
5.5 0.252 18
2-pole
5.5 0.220 24
S-D starting
5.5 0.198 30
7.5 0.217 6
7.5 0.157 12
7.5 0.130 18
7.5 0.113 24
9.0 – 11.0 0.136 6
9.0 – 11.0 0.098 12
9.0 – 11.0 0.081 18
9.0 – 11.0 0.071 24
15.0 0.087 6
15.0 0.063 12
15.0 0.052 18
15.0 0.045 24
18.5 0.059 6
18.5 0.043 12
18.5 0.035 18
22.0 0.046 6
22.0 0.033 12
22.0 0.027 18
30.0 0.027 6
30.0 0.020 12
30.0 0.016 18
37.0 0.018 6
37.0 0.013 12
45.0 0.014 6
45.0 0.010 12