Installationinstructions
WOLFbaseframes(includingintegrateddripstrip)areeitherpermanentlyxedto
the appliance or supplied loose.
Base frames delivered loose are knocked down for shipping and must be assembled,
aligned and secured to the base on site in accordance with the instructions enclosed
with the base frame.
The base-frame pitch and the appliance pitch match when appliances with pre-
installed base frames are split for shipping.
Supportbracket,item6,incaseof
factory-ttedbaseframe,ifdifferent
weightsleadtoanoffsetatcube
joints(assemblyonsite)
6
6
Insulatingstripttedon-site
Insulatingstripttedon-site
Offset
Connecting brackets, items 4 and 5, if air conditioning units are positioned next to
each other (assembly on site)
5
4
SW 8
Connecting bracket, item 1, in case of connection to, for example, a rotary heat ex-
changer (assembly on site)
1
SW 8
RWT