3061809_12106
Pump connection WolfboilercircuitandDHWcylinderprimarypumpsarefactory-
ttedwithplugs.Routethecablethroughtheboilerbackcutout.
Inserttheplugintothemarked-uplocationsintheplug-inconnector
strip,andsecurethecableswiththeirstrainrelief.
Installation / Electrical work
Outside temperature
sensor
(accessory)
Jointheon-siteleadoftheoutsidetemperaturesensorwiththe
plugsupplied.Inserttheplugintothemarked-uplocationinthe
plug-inconnectorstrip,andsecuretheleadwithitsstrainrelief.
Route the lead through the boiler back cutout. Fit the outside
temperature sensor to the north or northeast wall, 2 to 2.5m
abovegroundlevel.
DHW sensor
(accessory)
PushtheDHWcylindersensor(accessory)intothecylindersensor
well.Routetheleadthroughtheboilerbackcutout.Inserttheplug
into the marked-up location in the plug-in connector strip, and
securetheleadwithitsstrainrelief.
E1
programmable input
JointhecableofinputE1withtheplugsupplied.Inserttheplug
into the marked-up location in the plug-in connector strip, and
securethecablewithitsstrainrelief.Routethecablethroughthe
boilerbackcutout.
eBUS accessories Remotecontrol,radioclockmodule,radioclockmodulewithoutside
temperature sensor, receiver for wireless outside temperature
sensorandwirelessanalogremotecontrol.
Join the on-site accessory cable with the green plug supplied
(designatedeBUS).Inserttheplugintothemarked-uplocation
intheplug-inconnectorstrip,andsecurethecablewithitsstrain
relief.Routethecablethroughtheboilerbackcutout.
Note:
IfseveraleBUSaccessoriesaretobeconnectedsimultaneously,
connecttheseinparallelattheeBUSterminal.
A1
programmable output
JointhecableofoutputA1totheplugsupplied.Inserttheplug
into the marked-up location in the plug-in connector strip, and
securethecablewithitsstrainrelief.Routethecablethroughthe
boilerbackcutout.