EasyManua.ls Logo

Woodward Peak 200 User Manual

Woodward Peak 200
195 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Product Manual 35051
(Revision C, 11/2017)
Original Instructions
Peak®200 Digital Control for Steam Turbines
8200-1500 Bulkhead LVDC Standard
8200-1501 Bulkhead HV AC/DC Standard
8200-1502 Bulkhead LVDC ATEX – Zone 2
8200-1506 Bulkhead LVDC INMETRO
8200-1508 Bulkhead HV AC/DC NA Class1 Div2
8200-1503/1504/1505/1507/1509 Front Panel Versions
Installation and Operation Manual
Released

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Woodward Peak 200 and is the answer not in the manual?

Woodward Peak 200 Specifications

General IconGeneral
BrandWoodward
ModelPeak 200
CategoryController
LanguageEnglish

Summary

Chapter 1. General Information

Controller Overview

Description of the Peak200 as a field configurable control for various applications.

Chapter 2. Hardware Specification

Peak200 Description and Features

Highlights the upgrades and features of the Peak200 controller over the Peak150.

Input Power Specification

Specifications for both Low Voltage (LV) and High Voltage (HV) input power.

I/O Signal Specifications and Wiring

Detailed specifications and wiring for various I/O signals like speed sensors and analog inputs.

Troubleshooting Fault Codes

Lists CPU fault LED flash codes displayed for diagnostic purposes.

Chapter 3. Control Description

Four Fixed Operational Action Buttons on Front Panel

Explains the functions of the Reset, Start, Adjust, and Trip buttons.

Start Modes

Explains the Manual Start and Automatic Start options for turbine startup.

Operating Mode (Setting Turbine Speed)

Details how speed setpoints are adjusted via manual, analog input, or cascade control.

Chapter 4. Configuration Procedures

Configuring the Peak200

Instructions on how to configure the Peak200 for a specific application using the GUI.

Using Configure Menus

Guidance on navigating and using the configuration menus for system setup.

Chapter 5. Operating Procedures

Front Panel Operation

Details on operating the Peak200 using the front panel keypad.

Speed Control

Details the Speed Control screen, including setpoint entry and dynamic adjustments.

Overspeed Test Function (Speed Control Screen)

Allows testing of turbine electrical and mechanical overspeed protection logic.

Alarm Summary

Displays detected alarms with Event ID, description, and time/date stamp.

Shutdown Summary

Shows detected trip events with Event ID, description, and time/date stamp.

Speed and Cascade Dynamics Adjustments

Adjusting PID gains for speed and cascade control for optimal system response.

Chapter 8. Troubleshooting

Diagnostics

Information on internal diagnostic checks performed during boot-up.

Hardware or Operating System Problems -

Troubleshooting steps for issues related to CPU LED, watchdog timer, and I/O lockout.

Application Software Problems -

Troubleshooting steps for issues with GAP or GUI application software.

Troubleshooting Chart

Lists common symptoms with possible causes and solutions for resolution.

Alarms / Shutdowns

Explains how alarms and shutdowns are indicated and managed.

Wiring / Component Problems

Guidance on checking wiring connections and terminal blocks for issues.

Related product manuals